CHALLENGES
- The contaminated water had to be treated quickly before freezing temperatures
- Strict requirements had to be met to meet petroleum industry standards
BACKGROUND
The generated water, stored in a 37,000 m³ tank, had to be treated quickly and discharged into the MMC sanitary sewer before freezing temperatures set in. The operations needed to be carried out in compliance with the petroleum industry’s strict health and safety requirements.
SOLUTION
Following a brief settling period, a second pretreatment was performed in the storage tank via closed loop chemical oxidation.
Next, the pretreated water was decontaminated using a series of filters positioned as follows:
- Sand/anthracite
- Bag-type
- ULTRASORPTION™ media
- Granular activated carbon
The contaminated water was treated over a period of 3 weeks at a maximum flow rate of 1,390 L/min (2,000 m³/day) before being discharged into the municipal sanitary sewer system. The treatment performance was such that the strictest standards for discharge into storm drains were also met.
INTERESTED IN WORKING WITH US?
Contact us to learn more.
SEE SIMILAR PROJECTS
Removing Dry Tons from Texas Water Treatment Lagoons
PROJECTSERVICESDredging and Dewatering Biosolids ManagementINDUSTRYMunicipalPROJECT LOCATIONTexasPROJECT DATE2022QUANTITY200,000 dry tonnes of sludge dredgedCHALLENGESRemove up to 200,000 dry tons from two water treatment backwash lagoons. Lagoon 1 was no longer in...
Dredging, Dewatering and Transportation of Pulp Mill ASB Wastewater Sludge
PROJECTSERVICEDredging and Dewatering Biosolids ManagementINDUSTRYPulp & PaperPROJECT LOCATIONAlbertaPROJECT DATE2015-2023QUANTITY10,000 dry tonnes of wastewater solids removedCHALLENGESDredging, dewatering and transporting up to 10,000 dry tonnes of pulp mill...
Digester Cleaning with Significant Sand and Solids Build-up in California
PROJECTSERVICEDredging and Dewatering Biosolids ManagementINDUSTRYManufacturingPROJECT LOCATIONSouthern CaliforniaPROJECT DATE2020-2025QUANTITY350 million gallons/day of wastewater treatedCHALLENGESCleaning up to 30 digesters over a 5-year period from 2 plants in...