Biosolids Management

Dredging & Dewatering

Flexible Fluid Transport Solutions

Industrial Effluents Treatment

Lead Free Solutions

PFAS Removal Solutions

Water Main Renewal

Construction & Demolition Fines Recycling

Environmental Site Remediation

Industrial Degraded Sites Management

Regulated Materials Management

Risk Assessment

Soil and Material Management

PROJECT

Water Treatment from Pipeline Hydrostatic Testing

SERVICE
INDUSTRY

Municipal

PROJECT LOCATION
Sarnia, Ontario to Montréal, Quebec
PROJECT DATE

2016

QUANTITY
37,000 m3 of water treated
CHALLENGES
  • The contaminated water had to be treated quickly before freezing temperatures
  • Strict requirements had to be met to meet petroleum industry standards
BACKGROUND
As part of hydrostatic testing on sections of a pipeline linking Sarnia to Montreal, more than 31,000 m³ of water, containing a dye additive, was contaminated.

The generated water, stored in a 37,000 m³ tank, had to be treated quickly and discharged into the MMC sanitary sewer before freezing temperatures set in. The operations needed to be carried out in compliance with the petroleum industry’s strict health and safety requirements.

SOLUTION
The water was pretreated by introducing into the tank, during initial filling, a coagulant and flocculant via the tank’s 30 cm diameter transfer line.

Following a brief settling period, a second pretreatment was performed in the storage tank via closed loop chemical oxidation.

Next, the pretreated water was decontaminated using a series of filters positioned as follows:

  • Sand/anthracite
  • Bag-type
  • ULTRASORPTION™ media
  • Granular activated carbon

The contaminated water was treated over a period of 3 weeks at a maximum flow rate of 1,390 L/min (2,000 m³/day) before being discharged into the municipal sanitary sewer system. The treatment performance was such that the strictest standards for discharge into storm drains were also met.

INTERESTED IN WORKING WITH US?

Contact us to learn more.

SEE SIMILAR PROJECTS

Removing Dry Tons from Texas Water Treatment Lagoons

Removing Dry Tons from Texas Water Treatment Lagoons

PROJECTSERVICESDredging and Dewatering Biosolids ManagementINDUSTRYMunicipalPROJECT LOCATIONTexasPROJECT DATE2022QUANTITY200,000 dry tonnes of sludge dredgedCHALLENGESRemove up to 200,000 dry tons from two water treatment backwash lagoons. Lagoon 1 was no longer in...