PROJECT
Environmental Remediation – Dew Line, Cape Dyer, Nunavut
SERVICE
INDUSTRY
Military
PROJECT LOCATION
PROJECT DATE
QUANTITY
CHALLENGES
DYE-Main Cape Dyer was part of the DEW Line Site, built in the 1950’s as part of the effort to protect North America of potential attacks during the cold war. New technologies arrived and the DEW Line was eventually transitioned to the North Warning System.
The main challenge of this project was to work in very remote conditions, in often harsh weather conditions with a very short work season (June to September).
The DYE-M Site in Cape Dyer, Nunavut, presented several environmental issues such as the presence of:
- Soils contaminated by petroleum products, metals and PCBs;
- Drums and tanks of petroleum products;
- Contaminated water;
- Buildings containing asbestos and lead-based paint;
- Former landfill sites filled with materials from activities that took place at the Site.
BACKGROUND
SOLUTION
Qikiqtaaluk Environmental was awarded a contract to provide the necessary expertise and work force to carry out the following work:
- Management of hazardous and non-hazardous waste;
- Asbestos abatement and disposal;
- Management and closure of on-site landfills;
- Treatment of 1,400,000 L of water;
- Excavation and management of contaminated soils;
- On-site biotreatment/landfarming of hydrocarbon contaminated soils;
- Excavation of debris located at former landfill sites;
- Quality control of camp drinking water;
- Cleaning, demolition and off-site disposal of tanks;
- Decontamination and demolition of 12 buildings;
- Decontamination and demolition of 4 communication towers;
- Airstrip resurfacing, including granular material production;
- Management and operation of a 100-person camp, including domestic waste management and incineration.
INTERESTED IN WORKING WITH US?
Contact us to learn more.
SEE SIMILAR PROJECTS
Remediation of a federal site impacted by petroleum hydrocarbons (PHCs) and chlorinated volatile organic compounds (cVOCs)
PROJECTSERVICEEnvironmental Site RemediationINDUSTRYGourvernmentalPROJECT LOCATIONLondon, OntarioPROJECT DATE2020QUANTITY43,950,000 L of water treatedCHALLENGESThe challenge consisted in designing a site-specific program to remediate the soils and groundwater impacted...
Clean-up and remediation of the former Cap-Blanc Landfill, Anticosti Island
PROJECTSERVICEEnvironmental Site RemediationINDUSTRYMunicipalPROJECT LOCATIONAnticosti Island, QcPROJECT DATE2022QUANTITY123 m3 of soil disposedCHALLENGESThe main challenges consisted in stabilizing the oceanfront embankment and disposing of the soils and materials by...